MEMBER ITEMS FOR SALE
Custom Knives | Other Knives | General Items
-------------------------------------------
New Posts | New PhotosAll Photos



Go Back   The Knife Network Forums : Knife Making Discussions > Custom Knife Discussion Boards > Knife Making Discussions > Heat Treating and Metallurgy

Heat Treating and Metallurgy Discussion of heat treatment and metallurgy in knife making.

Reply
 
Thread Tools Display Modes
  #16  
Old 07-22-2004, 03:51 PM
rlinger's Avatar
rlinger rlinger is offline
Steel Addict
 
Join Date: Jan 2003
Location: WV
Posts: 140
Steve,

I moderately ramp to preheat temperature and hold only 7 min.
quickly ramp to 1950 minimum 1965 F maximum and soak 25 min.
rapid air quench
snap temper @ about 300 F / ! hr.
deep cryo minimum 12 hr.
temper @ 400 F / 2 hr (twice)

About 60 HRc

I am fairly sure there is a lose of toughness by using the higer austenitizing temperature. Tempering very high will result in lose of corrosion resistance. Except for BG-42 I try not to temper higher than 600 F. 400 F has worked well for me on S30V. I sometimes temper ATS-34 as high as 600 F and have gotten about 60 HRc.

RL


__________________
rlinger - http://riflestocks.tripod.com

Last edited by rlinger; 07-22-2004 at 04:10 PM.
Reply With Quote
Reply

Tags
blade, knife, knives


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 09:52 PM.




KNIFENETWORK.COM
Copyright © 2000
? CKK Industries, Inc. ? All Rights Reserved
Powered by ...

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
The Knife Network : All Rights Reserved