View Single Post
  #7  
Old 01-23-2017, 09:31 PM
jimmontg jimmontg is offline
Guru
 
Join Date: Jan 2016
Location: Now live in Las Cruces NM.
Posts: 1,345
Damon is the man and we are always glad to help. I've done in a loveless or two back in the day. The old saying measure three times and cut once applies to corbys and loveless bolt installation, plus a few more to boot.

It pays to do a dry run on putting a knife together. That way you don't end up with a 6-7 minute assembly with 5 minute epoxy.
Reply With Quote